OUR HISTORY

OUR HISTORY

2024 Within the framework of the Joint Operation Agreement a 4-party Memorandum between Neftekhim, Secondary School named after Sultanmakhmut Toraighyrov, Pavlodar Technological College and Toraighyrov University was signed to organize joint work of the parties on the basis of mutual cooperation, support for schoolchildren, college and university students.
2023 The Registration Certificate for “Epoxy Compound” chemical product was received. The production capacity is 10 thousand tons per year.
2021 Launch of the MTBE Desulfurization Unit.
The calibration laboratory has successfully passed accreditation for compliance with the requirements of GOST ISO/IEC 17025-2019 “General Requirements for the Competence of Testing and Calibration Laboratories.” Recertification was carried out for compliance of the Quality Management System with the requirements of ST RK ISO 9001:2016 (ISO 9001:2015) (ISO standard of Kazakhstan) and for compliance of the Quality Management System with the requirements of ISO 9001:2015; an international IAF certificate received.
2020 The Propylene Concentration Unit was upgraded increasing its capacity to 10 tons per hour.
2019 The production of polymer products (big bags) with a capacity of 2 million pieces per year was established.
The plant research laboratory has been successfully reaccredited for compliance with the requirements of GOST ISO/IEC 17025-2019 “General Requirements for the Competence of Testing and Calibration Laboratories.”
2015 The Polypropylene Production Unit was upgraded increasing its capacity to 70,000 tons per year.
2014 The Polypropylene Pelletizing Unit was put into operation together with Leistritz Extrusionstechnik GmbH, Germany.
2013 The Polypropylene Bag Production Workshop was built and put into operation together with Starlinger GmbH, Austria.
Neftekhim became the winner of the Altyn Sapa national contest and received The Best Production Enterprise Award.
2012 Neftekhim successfully passed an inspection audit for compliance of the QMS with the requirements of ST RK ISO 9001:2009, ISO 9001:2008 and received an international certificate from the TQCSI certification body, Australia.
2010 Early achievement of design capacity: MTBE – 20 thousand tons per year; polypropylene – 30 thousand tons per year.
2009 Commissioning of the MTBE and Polypropylene Powder Production Plant.
2006 Start of the plant construction together with Xinjiang Sanbao, PRC.
2005 Kompaniya Neftekhim LTD LLP was formed for the construction of the plant to process oil gases from Pavlodar Oil Chemistry Refinery and to produce methyl tert-butyl ether (MTBE) and polypropylene.